DANH MỤC

ATTEC Factory

ATTEC Factory

- Owner:  Lifting Equipment ATTEC Joint Stock Company
- Total land area: 10,000 m2
- Total floor area of factory construction: 6,000m2 x 2 floors = 12,000m2
- Contract amount: VND 42 billion
- Location: Lai cach IP, Cam Giang, Hai Duong
- Construction time: 08/2024
- Scope of work: EPC Contractor, design and build all construction and M&E items

Bản quyền © 2019 thuộc về FBT Vietnam JSC